Ghaziabad News: Residents likely to face disrupted Power Supply due to THIS reason in these regions, check details

 Ghaziabad News
Ghaziabad News

Ghaziabad News:The city is likely to have disrupted Power supply for the next 3 days. There is also a possibility that the residents will have to make arrangements for the drinking water as well, without no power there will be a crisis for drinking water also. The Ghaziabad city gets the Power supply from the Vasundhara Sector-10 and sector-16. Apart from this these areas also get power supply from these two sectors. These are Delta colony , Brij Vihar and vaishali sector 4 and 9.

Supply affected due to RapidX Train Construction Work

The authorities are saying this inconvenience will be there for 2-3 days due to the RapidX Train work. The Power supply will be affected from 10am Saturday morning and is likely to be there till 21st August. The residents are demanding the authorities to make additional arrangements. Without Power, it will be impossible for people to survive in such humid weather.

'Authorities should have kept a back up ready'

The Power and Water supply will be affected due to the construction work of the RapidX Train. Residents of Vasundhara Sector -10 and 16 have been struggling with Power cuts due to the Tunnel work of the RapidX Trains. Residents have been blaming the authorities for not keeping a backup ready in such a situation.

Keep watching our YouTube Channel ‘DNP INDIA’. Also, please subscribe and follow us on FACEBOOK